|
|
|
|
Dan and Paul hoofing over to Cap Mall with 16' Base |
|
|
|
|
|
|
|
|
Assembling the new gate arm |
|
|
|
|
|
|
|
|
Dan Installing new LED Gate Light on Gate Arm |
|
|
|
|
|
|
|
|
The new LED lights assemble easily |
|
|
|
|
|
|
|
|
No drilling. Just place and clamp |
|
|
|
|
|
|
|
|
The LED lights just plug together |
|
|
|
|
|
|
|
|
Paul plugging in the cable |
|
|
|
|
|
|
|
|
|
The crew was smart. They assembled in the shade |
|
|
|
|
|
|
|
|
Assembled Gate Arm ready to go |
|
|
|
|
|
|
|
|
Even the Trainmaster Jim helped us out! |
|
|
|
|
|
|
|
|
The GR10 comes by the Carnage |
|
|
|
|
|
|
|
|
Signal Maintainer Dave on Train No. 2 with the Boy Scouts |
|
|
|
|
|
|
|
|
Some of Dave's great Boy Scouts |
|
|
|
|
|
|
|